Al Dana Amphitheatre wishes to appoint a Design and Build Contractor for the relocation and renovation of the sound booth, control room, and services connection located in the Al Dana Amphitheatre.
يرغب مسرح الدانة في تعيين مقاول تصميم وبناء لنقل وتجديد حجرة الصوت وغرفة التحكم ووصلة الخدمات الموجودة في مسرح الدانة.
Mandatory Requirements | Pass/Fail |
Insurance (All Tenders are required to submit insurance within thesubmitted bid) This requirement is to protectthe project owner or client from potential liabilities and risks associatedwith the project. The Insurance coverage should provide financial protectionin case of accidents, damages, or other unforeseen circumstances during the courseof the project. | |
Years of Experience in the Field (tendererto submit details of first complex precast project including date of theproject) The tenderer should have a minimum of 15 years of experience inworking with complex precast concrete projects. | |