The Electricity and Water Authority (EWA) plans to establish a solar power plant with a minimum capacity of 44 MWp on the University of Bahrain campus, aiming to generate proximately 75GWh per year. The university has a vast car park and open land area where EWA intends to develop ground-mounted and car park solar PV systems. This project aligns with Bahrain’s commitment to green initiatives to mitigate climate change, as announced by HR the Crown Prince under the directives of HM the King, aiming to reduce Bahrain’s greenhouse gas emissions by 30% by 2035 and achieve net zero by 2060.
The tender for the project will be implemented on a turnkey basis, covering engineering, design, manufacturing, supply of materials, installation, testing, commissioning, and civil and electromechanical works.,
تخطط ھیئة الكھرباء والماء لإنشاء محة للطاقة الشمسیة في حرم جامعة البحرین بسعة لا تقل عن 44 میجاواط/ذروة، بھدف تولید حوالي 75 جيجاواط ساعة سنوياً. سيتم استغلال المسحات الكبیرة لموقف السیارت والمسحات المفتوحة في الجامعة لتطویر أنظمة الطاقة الشمسیة الكھرضوئیة المثبتة على الأرض وفي مواقف لسیارات. یأتي ھذالمشروع في إطار التزم البحرین بالمبادرات الخضراء للتصدي لتغیر المناخ، كما أعلن عنه سمو ولي العھد بناءً على توجیھات جلالة الملك، والذي یھدف إلى تقلیل انبعاثات غازات الاحتباس الحراري بنسبة 30% بحلول عام 2035م، وتحقيق صافي انبعاثات صفري بحلول عام 2060م.
سيتم طرح المناقصة للمشروع على أساس تسليم المفتاح، حيث ستغطي جميع الجوانب بما في ذلك الهندسة، التصميم، التصنيع، توريد المواد، التركیب، الاختبار، التشغیل، بالإضافة إلى الأعمال المدنیة والميكانيكیة والكھربائیة. ,
Mandatory Requirements for Technical Evaluation:
Below are the mandatory requirements and shall be include in tender submission:
1) Bidders must have successfully commissioned at least ten (10) grid-tied solar PV projects on a turnkey basis (out of which at least Two (2) are Solar PV car park projects and One (1) are ground mounted solar projects) in the last 3 Years in any country globally (cumulative over members in the case of a consortium); and
2) Eligible bidders shall have experience in design, engineering, supply, erection, Supervision, testing & commissioning of land-mounted, grid-connected solar power plants of a capacity equivalent or higher (minimum 20MW) than the capacity of the Project under consideration in the last five years in any country globally (cumulative over members in the case of a consortium); and
3) Annual cumulative turnover of at least $50,000,000 (Fifty Million US Dollars) over the last 3 Year (2021, 2022 & 2023) (cumulative over members in the case of a consortium); and
4) Submission of the audited Financial Reports proving the financial capability for the last 3 Year whereas the minimum average Liquidity Ratio shall not be less than 1.5 with yearly positive earnings for evaluating Profitably.
The tenders which do not meet the mandatory requirements will not pass the relevant section and such tenders may be rejected.